COURS.

Construction Scheduling Games

Webinaire / les 13 et 14 octobre 2022 /
Code : 1008-WEB22

Inscrivez-vous
  • APERÇU
  • FORMATEUR

APERÇU

By participating in this webinar, you will learn:

  • The intended purpose of construction scheduling is to assist with proper planning and coordination of a project. Unfortunately, construction schedules are often used to help build claims against project owners.
  • Much of the process of building claims through the use of schedules involves schedule gamesmanship.
  • This exclusive two-part webinar identifies more than 15 scheduling games and offers some 45 suggested defenses to help prevent schedule gamesmanship.
  • Some suggested defenses involve changes to contract document language and thus need to be implemented during the design phase.
  • Other suggested defenses are pragmatic in nature and can be implemented on a daily basis by a knowledgeable construction management team even in the absence of specification language.

Description:

For both owners and contractors, a careful drafting and reading of the schedule specifications is imperative. Contractors can lose their rights; owners can lose their shirts. The intent of schedule specifications is to measure progress on the job but also to mitigate future delays and resolve past disputes. Learn what some industry-recognized specifications have done to combat abuse and why further changes may still be necessary.

The Construction Schedule Games Updated & Revisited paper will be provided to all attendees to serve as a checklist for identifying and addressing schedule games. This thorough treatment of the subject cannot be presented in one webinar, so it is being presented in a special two-part series. A 10-to-15 minute period has been reserved at the end of each session for an interactive question-and-answer period so attendees can discuss specific issues or gain additional knowledge about topics discussed.

Course Outline:

Whether through intentional strategy, inattention to schedule specs or merely sloppy practices, learn the various sorts of schedule games and why you need to be aware of them, including:

  • Introduction
  • Multiple critical paths
  • Multiple calendars
  • Preferential logic & open end activities
  • Float ownership
  • Sequestering of float
  • Early completion schedules
  • Missing or added constraints
  • Long lead time procurement activities
  • Improper and manipulated updates
  • Unsubmitted, late and inaccurate baseline submittals
  • CPM software settings that affect schedule calculations and completion dates
  • Conclusion
  • Questions & Answers

Who Should Attend:

This webinar is a must if you're a contractor, public or private owner, subcontractor, construction manager, owner's representative, architect, or other design professional providing project oversight services.

Horaire : 12:00 PM - 2:00 PM EDT

Exigences techniques

Pour les utilisateurs de PC
OS: Windows 7, 8, 10 ou plus récent

Navigateur :
IE 11 ou plus récent, Edge 12 ou plus récent, Firefox 27 ou plus récent, Chrome 30 ou plus récent

Pour les utilisateurs de Macintosh
OS: MacOS 10.7 ou plus récent

Navigateur :
Safari 7+, Firefox 27+, Chrome 30+

iOS
OS: iOS 8 ou plus récent

Android
OS: Android 4.0 ou supérieur

FORMATEUR

Jim Zack

Jim is the Senior Advisor to the recently formed Ankura Construction Forum™.

The Forum strives to be the construction industry’s resource for thought leadership and best practices on avoidance and resolution of construction project disputes globally. Jim was the founder and Executive Director of the Navigant Construction Forum™. Formerly he was the Executive Director, Corporate Claims Management Group, Fluor Corporation, one of the world’s largest EPCM contractors. Prior to this Jim was Vice President of PinnacleOne and Executive Director of the PinnacleOne Institute and a Senior Construction Claims Consultant for CH2M HILL, Inc.

He has, for 46 years, worked on both private and public projects throughout the U.S. and in 28 countries abroad. Jim has worked for both contractors and owners on more than 5,000 claims in his career. He a Fellow of AACE International, the Royal Institution of Chartered Surveyors and the International Guild of Project Controls. In the construction claims field, he is a recognized and published expert in mitigation, analysis and resolution or defense of construction claims and disputes. Jim is a Certified Construction Manager (CCM), a Certified Forensic Claims Consultant (CFCC), and a Project Management Professional (PMP).



INSCRIVEZ-VOUS
VOUS N’ÊTES PAS INTERESSÉ PAR CE COURS ?

Nous visons toujours à améliorer la qualité de nos cours. Veuillez sélectionner les raisons pour lesquelles vous pensez que ce cours est inadéquat (Cochez toutes les cases qui s’appliquent).

Svp cochez cette case :
Note d’évaluation pour cette formation

Nous ne disposons pas suffisamment de réponses des participants pour générer une note pour cette formation.

UNITÉS & FRAIS
  • 4 Heures de formation continue

299 $ (+ TPS/TVQ)

Inscrivez-vous




Accumulez vos HEURES DE FORMATION CONTINUE

Tous les cours du CIPE vous permettent d’obtenir vos Heures de formation continue ; utiles pour ceux qui doivent accumuler et soumettre leurs Heures comme l’exige l’Ordre des ingénieurs du Québec.

Ces exigences de formation prennent fin le 31 mars 2023 !

VOIR LES COURS
Abonnez-vous à notre bulletin électronique
Formation en entreprise

Les AVANTAGES de la formation de groupe en ligne :

  • Efficacité et coût
  • Des cours de grandes qualité
  • Flexibilité
  • Pratique
  • Confidentialité
  • Obtenez un certificat avec des Heures de formation continue
En savoir plus
Top